How does Link change with the documents on the sharepoint project portal for TFS 2010?

advertisements

As I understand configuration management mean you have to track all your artifacts(requirement, design, code,test plan, test cases, test result, user manual) so at any point of time you can bring your changeset and see what the corresponding documents version with it, since we put our documents on the sharepoint not the source control and of curse we enable versioning, how can I link the changeset with the corresponding doc version and how also link the specific build with corresponding doc version

Thanks


Link your changesets to work items. Link your work items to the version of the Sharepoint document you want using a hyperlink link type.

If you have versioning on your document libraries in sharepoint make sure you link to the specific version of the document, not just the most recent one.